| Title |
Presenter |
| Technical proposals for the custody transfer of heat meters in the light of the MID |
Adunka |
| Report on the draft WELMEC Guideline 7.2 "Software requirements". |
Grottker |
| Market surveillance procedures - Considerations - |
Hahnewald |
| Considerations of a manufacturer for the introduction of the module H1 |
Hoffmann |
| Considerations of a manufacturer for module selection for water and heat meters |
Smart |
| EMC test on flow-through meters |
Behnke |
| New transportable standard measuring system for displaying and transmitting the electrically simulated scale Thermal energy |
Rose |
| Tasks of an independent inspection body at the time of MID |
Leitgen |
| Overview of the status of the national implementation of the MID and technical conclusions |
Rose |
| The Measurement Instrument Directive (MID): New ways to assess the conformity of heat meters - Part II -. |
Utz |
| Technical advices for the verification procedures of heat meters in the light of the MID |
Adunka |
| Report on the WELMEC Draft Guide 7.2 Software Requirements |
Grottker |
| Considerations of a manufacturer for the module choice for water- and heat meter |
Smart |
| Experimental study for accelerated durability tests |
Rose |
| Main Tasks of an independent Testing-Laboratory for Heat Meters at the Times of MID-Regulations in Europe |
Leitgen |
No responses yet